Email Us
Case

Battery Energy Storage Solution Cases


Project Name: Belgian Industrial Park

Project Name: National Telecommunications & Data Center

Country: Philippines (Global)

Industry: National Telecommunications & Data Center

Models: OPzV 2-3000, OPzV 2-2000

Introduction: Since 2011, Ruida has established long-term cooperative partnerships with Philippine telecom operators and has provided them with a large number of non-acidic solid-state batteries.


Country: Yemen
Industry: Solar Energy Storage
Models: OPzV 2-2500, OPzV 2-2000, OPzV 2-1500, OPzV 2-1000, OPzV 2-800
Introduction: Ruida is the exclusive battery brand authorized by UNOPS (United Nations Office for Project Services) for all energy storage projects in Yemen. 100% of UN-aided projects in Yemen use Ruida batteries.


Country: Mali (Africa)

Industry: PV Energy Storage

Model: OPzV 2-2000

Introduction: Ruida provides stable energy storage systems for local schools, hospitals, and banks in Mali.


Country: Thailand

Industry: Utility Power

Introduction: RITAR has long supplied non-acidic solid-state lead batteries for regular projects of the Electricity Generating Authority of Thailand (EGAT). RITAR batteries have been highly recognized by EGAT for their superior quality and stable performance.


Client: Germany  (NDA)

Countries: Tanzania, Rwanda

Industry: Residential Solar Systems

Model: OPzV Series

Introduction: Residential solar systems for rural areas. Since 2015, the client has maintained a close cooperative relationship with Ruida.


Location: Zhihui Plaza, Luohu District, Shenzhen
(within a central urban commercial building)
Commissioning Time: October 2022
Industry: Solar-storage integrated power station project
Model: OPzV 2-430, 30kW/168kWh
Introduction:
This demonstration project is Shenzhen Luohu District Government-led, and is the city’s first non-acidic solid-state lead battery energy storage project. Adopting the "Battery Wall" concept, it allows flexible design of the energy storage station according to site conditions, providing an excellent "zero-carbon" solution for space-constrained commercial and industrial scenarios!


Project: Jiangmen Panasonic Electronics 2MW/8MWh Energy Storage Project
Scheduled Time: Initial commissioning by the end of December 2023
Industry: Commercial & Industrial (C&I) Energy Storage Project
Introduction:
This project is a user-side "Commercial & Industrial Energy Storage" demonstration project jointly developed by Ruida Group and Panasonic. It adopts 2V 770Ah non-acidic solid-state batteries.


Project: Ruida Industrial Park in Hengyang, Hunan

Scale: Energy Storage 500kW/2.16MWh

Model: OPzV 2-1500


Project: Cuihu Sports and Culture Park Project

Timeline: Completed in September 2023, selected as one of the first "Zero-Carbon High-Value" demonstration projects in Luohu District, Shenzhen in 2023

Introduction: Adopting the "Zero-Carbon High-Value" architectural solution, the project integrates distributed PV, energy storage, and smart management systems. It features high safety and energy efficiency, providing a comprehensive zero-carbon solution for urban public spaces.


Project: Brazil Pavilion at the 2010 Shanghai World Expo

Scale: 8MWh Energy Storage Station

Introduction: Constructed by Ruida Group in 2010, this 8MWh energy storage station covers an area of 18 square meters. It was China's first large-scale high-grade electrochemical energy storage station, showcasing cutting-edge energy storage technology at the time.


Project: Luhe Service Area Energy Storage Project on Guangdong Chaozhou-Huizhou-Highway

Scale: 150kW/550kWh

Introduction: Located at the service area gas station, this project adopts non-acidic solid-state lead batteries. It ensures safe and green power supply for charging piles, fulfilling peak shaving and valley filling functions to support green energy consumption.


Project: No. 11 Science and Technology Parking Lot Energy Storage Project in Tianjin

Time: Put into operation in April 2022

Industry: PV Storage Integrated Project

Introduction: Equipped with non-acidic solid-state (OPzV) energy storage systems and self-developed PV integration systems, the project comprises four parts: PV power generation, energy storage, charging piles, and smart management. It integrates PV, energy storage, and charging into a single system, meeting the charging needs of new energy vehicles while ensuring grid stability.


Project: State Grid Poyang Lake Charging Station

Time: Put into operation on June 29, 2023

Introduction: A large-scale new energy vehicle charging station jointly built by State Grid Jiangxi Electric Power and local enterprises. It integrates energy storage, PV, fast charging, smart management, and other functions. Each charging station can provide 2177kWh of energy storage, with an annual carbon reduction of approximately 1250 tons.


Project: Yongqing Environmental Protection Project in Hengyang

Time: Construction started in December 2022

Industry: User-side Energy Storage Project (14MWh)

Introduction: A user-side energy storage demonstration project invested by Yongqing Environmental Protection, adopting 2V 770Ah non-acidic solid-state lead batteries. It is one of the large-scale non-acidic solid-state battery energy storage projects in the Hengyang area.


Project: Future Building "Light-Storage Direct (PEDF)" Demonstration Project in Shenzhen International Low-Carbon City

Time: Put into operation in October 2018

Introduction: Located in the underground parking lot of Future Building at Shenzhen International Low-Carbon City, this project adopts a 12.75MWh non-acidic solid-state battery energy storage system. It is the world's first large-scale architectural grid-connected PV storage project and a demonstration project for energy conservation and emission reduction in buildings jointly built by CERC (China Energy Research Institute).


Project: China Construction Science & Rongsheng Primary School Project (Guangming District, Shenzhen)

Time: Put into operation in March 2023

Industry: PV-Storage Integrated Power Station Project

Introduction: A landmark "Green Campus" demonstration project jointly constructed by China Construction Science & and Ruida Group. It is also Shenzhen’s first "Green Campus" demonstrator, adopting 2V 500Ah non-acidic solid-state lead batteries. It provides a zero-carbon transformation solution for industrial campus projects with similar high safety requirements.


Project: Shenzhen Overseas Chinese Town User-Side Energy Storage Project

Time: Construction started in December 2022 (19MWh)

Industry: User-Side Energy Storage Project

Introduction: A landmark user-side energy storage project in Shenzhen, adopting 2V 770Ah non-acidic solid-state batteries. It is the first large-scale non-acidic solid-state battery energy storage project in the city. With a one-time construction scale of 19MWh, it is located at the junction of OCT East and global world cultural heritage, providing an innovative "zero-carbon" solution for commercial and industrial application scenarios.


Project: Dongcheng Mansion 0.25MW/1MWh Energy Storage Project

Time: Put into operation in May 2023

Industry: Commercial & Industrial (C&I) Energy Storage Project

Introduction: As Ruida Group’s first indoor dual-purpose "C&I Energy Storage" demonstration project in Hunan Province, it fully demonstrates the high safety of OPzV nanometer silicon solid-state lead batteries.


Project: Dongcheng Mansion 0.25MW/1MWh Energy Storage Project

Time: Put into operation in May 2023

Industry: Commercial & Industrial (C&I) Energy Storage Project

Introduction: As Ruida Group’s first indoor dual-purpose "C&I Energy Storage" demonstration project in Hunan Province, it fully demonstrates the high safety of OPzV nanometer silicon solid-state lead batteries.


Project: Foshan Kepler Data Center Energy Storage Project (Guangdong)

Time: Put into operation in November 2023

Industry: Data Center Energy Storage Project

Introduction: Ruida Group’s landmark "Data Center Energy Storage" project in Foshan, and the first "Data Center Energy Storage" demonstration site in Guangdong Province. The project adopts 2V 770Ah non-acidic solid-state batteries.


Project: Changlong Herbalife 0.5MW/2MWh Energy Storage Project

Time: Put into operation in December 2023

Industry: Commercial & Industrial (C&I) Energy Storage Project

Introduction: A landmark "C&I PV-Storage Energy Storage" demonstration project jointly created by Ruida Group and Changsha High-Tech Industrial Development Zone. The project adopts 2V 770Ah non-acidic solid-state batteries.


Country: USA

Industry: Data Center Energy & Data Center

Model: OPzV 2-800

Introduction: Since 2009, Ruida has maintained a strategic partnership with the top 3 data center operators in the US. Thanks to the outstanding performance of our products, we have won the title of "Top 3 Supplier" for American customers every year.


Country: Indonesia

Industry: Base Station

Models: OPzV 2-2000, OPzV 2-1000, OPzV 2-800, FT12-100, FT12-150

Introduction: As the most competitive battery product series in the Indonesian market, our products are sold to more than 20 base stations of Indonesian telecom operators every month. We are also the first Chinese supplier to provide non-acidic solid-state batteries for Indonesian telecom base stations, supplying 50 sets of FT series products annually.


Country: Panama (South America)

Industry: PV Energy Storage

Model: OPzV 2-1000

Introduction: Ruida provides PV energy storage systems for multiple schools in Panama.


Country: Indonesia (Military Emergency Rescue Center)

Industry: Energy Storage (250kW/1.04MWh)

Model: OPzV 2-1500


Country: Yemen (Hospital Data Center)
Industry: Energy Storage (250kW/1.04MWh, 500kW/3.24MWh)
Models: OPzV 2-1000, OPzV 2-2000


Project: Nepal Hydropower Station PV-Storage Project

Industry: PV Energy Storage (250kWp/720kWh)

Model: OPzV 2-1000


Country: Navarre, Spain

Industry: Wind Farm & Wind Power Energy Storage

Model: OPzV 2-2000


Country: South Africa

Industry: Utility Power & Grid Peak-Shaving Energy Storage System (30MW/100MWh)

Model: OPzV 2-3000


Our Information
Get in Touch
Contact Info
Ritar International safeguards global energy applications with intrinsically safe energy storage technology.
Add
10th Floor, Tower C, Building 1, Software Industry Base, Gaoxin South 10th Road, Nanshan District, Shenzhen, China
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. Part of the tracking is necessary to ensure SEO effectiveness,
By using this site, you agree to our use of cookies. Visit our cookie policy to learn more.
Reject Accept